Examples of the biggest projects implemented:
- Construction of a 600 m3/h industrial and storm wastewater treatment plant at "Vyksa Steel Works", region of Nizhniy Novgorod (2008).
- Construction of a 400 m3/h emulsion make-up and cleaning system at "Uraltrobprom" Pipe Works in Ural (2009).
- Construction of a 240 m3/h mixed industrial and storm wastewater treatment plant at "AGC Bor Glasswork" in the region of Nizhniy Novgorod (2009).
- Construction of a 250 m3/h ultrailtration plant at "Cherepovetskiy "Azot", Vologda region (2009).
- Renovation of the chemical water treatment department at"BMU" fertilizer plant in Saratov Region. The project involved installation of a 450 m3/h ultrafiltration plant and a 250 m3/h desalination plant (2010).